06.05.2024: New hospital building in Memmingen with heat from wastewater

For the new hospital in Memmingen, we supply 450 kW of heat from the newly installed mixed water sewer with our Therm-Liner system. The length of the system is 260 metres.

In this way, we are making a significant contribution to the sustainability criteria of the new hospital building, which form the basis for the ‘Green Hospital’ award. It’s great that we can be part of it.

Scroll al inicio