For the new hospital in Memmingen, we supply 450 kW of heat from the newly installed mixed water sewer with our Therm-Liner system. The length of the system is 260 metres.
In this way, we are making a significant contribution to the sustainability criteria of the new hospital building, which form the basis for the ‘Green Hospital’ award. It’s great that we can be part of it.