06.05.2024: New hospital building in Memmingen with heat from wastewater

For the new hospital in Memmingen, we supply 450 kW of heat from the newly installed mixed water sewer with our Therm-Liner system. The length of the system is 260 […]

06.05.2024: New hospital building in Memmingen with heat from wastewater read more »