The new heating plant of Stadtwerke Tuttlingen on Stadionstraße is being expanded with two large heat pumps to generate heat from wastewater. The heat will be extracted from the sewer in Nendinger Allee, on the other bank of the Danube: 360 kW extraction capacity before the heat pump, with a system length of 112 m, laid via a development pipe through a flush borehole under the Danube and thus made available to the heat pumps, which in turn scale up the temperatures. The heat generated is fed into a heating network that currently supplies 53 buildings, with capacity for even more customers. Installation is scheduled to be completed by the end of the year, and the coming heating season will already benefit from the wastewater heat.
Thank you for this order, which is (almost) around the corner for us!
#Abwasserwärme #Tuttlingen #Wärmenetz #Wärmewende #Energie aus Abwasser