How long does it take to install a system?

We estimate that the installation of a heat exchanger system will take around one to four weeks, depending on its size. If necessary, one or two weeks may need to be added for construction of the infrastructure, i.e. the pipe from the sewer to the boiler room. The time required varies for every project and is defined precisely beforehand. Only heavy rains which fill the sewer with unusually large volumes of water can cause delays in the installation of the heat exchanger modules. At the moment, the lead times for the building and installation of a plant are 2 to 3 months, depending on workload. Installations within the EU do not require any additional time.