How long does it take to install a Therm-Liner?

It takes between one and four weeks to install a heat exchanger system, depending on its size. In certain cases, one or two additional weeks may be needed for the construction of the interface, i.e., the pipe connecting the pipeline and the heating room. The duration is different for each project. The only circumstance that could delay the installation of the heat exchanger modules is when heavy rains fill the pipeline with massive amounts of water. Currently, you must reckon with a lead time of two to three months for the manufacture and installation of a Therm-Liner system.