The heat extraction capacity of the THERM-LINER system, as defined during the planning phase, must be available at all times after the system is commissioned. Our systems are therefore designed for the minimum wastewater flow rate and minimum wastewater temperature. Conversely, this means that THERM-LINER systems almost always operate under more favorable conditions, thereby reducing the heat pump’s power consumption. However, the design point must be deliberately set low to ensure reliable energy supply under all circumstances. The fouling of the modules that occurs after commissioning—known as biofilm formation—is already taken into account during the planning phase. Although biofilm formation reduces the system’s performance, it can be calculated in advance. We therefore oversize the THERM-LINER systems to permanently compensate for this fouling. Cleaning or maintenance is therefore not necessary.

